Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.