Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing - NSP Article - Eleven Miles Out. Now almost eleven miles from the end of Haisla Boulevard, the Kitimat-Terrace highway has stretched to within six miles of the Kitimat river bridge. This part of the roadbed is still very much in the making, but several miles of roadway nearer to the Kitimat townsite are at finished grade and surface. Workmen driving over the highway report the finished part "a pleasure to travel."
Photo showing - NSP Article - Eleven Miles Out. Now almost eleven miles from the end of Haisla Boulevard, the Kitimat-Terrace highway has stretched to within six miles of the Kitimat river bridge. This part of the roadbed is still very much in the making, but several miles of roadway nearer to the Kitimat townsite are at finished grade and surface. Workmen driving over the highway report the finished part "a pleasure to travel."