Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Notes
Title based on content of photograph. -- Alcan Negative No. 29337. -- The circus tent assembly line was erected . Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. 73.3.6.6