Photo showing two workers, one facing the camera inside a lit tunnel or enclosed space dressed in protective clothing, possibly metal workers or welders.
Photo showing two workers, one facing the camera inside a lit tunnel or enclosed space dressed in protective clothing, possibly metal workers or welders.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.