Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).