Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing view looking south along railway right of way between Anderson and Moore Creeks showing excavation for steel water line and Tote Road at righht.
Photo showing view looking south along railway right of way between Anderson and Moore Creeks showing excavation for steel water line and Tote Road at righht.
Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.