Photo showing a TD-24 spreading a layer of alrge stones at the base of Nechako Damn west to the rock fill portion which is laid in first, these layers of various size rock, stone and clay with all slope towards the rock fill at about the degree pitch.
Photo showing a TD-24 spreading a layer of alrge stones at the base of Nechako Damn west to the rock fill portion which is laid in first, these layers of various size rock, stone and clay with all slope towards the rock fill at about the degree pitch.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.