Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.