Photo showing 'under construction' - Kitimat River Bridge (18 miles north of Kitimat); construction of deck of bridge, road link with Terrace, Highway 25, (span near completion). Became Highway 37 in 1975.
Photo showing 'under construction' - Kitimat River Bridge (18 miles north of Kitimat); construction of deck of bridge, road link with Terrace, Highway 25, (span near completion). Became Highway 37 in 1975.
Photo showing Mrs. Barry Blix, evidently pleased during registration for night school courses, helping with the registration. Marilyn Westby, smiling at the far end of the table, signed up for Interior Design and Yvonne Lee, beside her, will be taking Bookkeeping.
Northern Sentinel - (A)Historical
(1)School District #80
(a)Adult Education
Scope and Content
Photo showing Mrs. Barry Blix, evidently pleased during registration for night school courses, helping with the registration. Marilyn Westby, smiling at the far end of the table, signed up for Interior Design and Yvonne Lee, beside her, will be taking Bookkeeping.