Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.