Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of Kemano in 1953. There are two buildings and a tall chimney or smokestack near the foreground, a large open space with many small huts or tents in the middle distance, and rows of long buildings in the background.
Photograph of Kemano in 1953. There are two buildings and a tall chimney or smokestack near the foreground, a large open space with many small huts or tents in the middle distance, and rows of long buildings in the background.
Notes
Stamp on back of photo: "ANSCO PRINTON, Munshaw Colour Service Ltd., Nov 13 1953."