Collection of slides, photos, and documents from John McLachlan regarding early smelter and Kitimat.
Slides - Three Kodak Carousels - colour
10 8 x 10 photos colour & b&w
Photocopies - Offer of Employment
Letter of Acceptance, Personnel
Introduction Form, Decaration of Regular
Employment, Job Description, three
colour photographs and paper framed b&w photograph
John McLachlan arrived in Kitimat in 1953 as a 23-year-old immigrant and went on to work at Alcan's Property Engineering Department for almost 40 years. He started out as a land surveyor and cartographer in the town's early years and ended his career as a Senior Legal Draftsmen.
Custodial History
Jean Lunny
Scope and Content
Collection of slides, photos, and documents from John McLachlan regarding early smelter and Kitimat.
Slides - Three Kodak Carousels - colour
10 8 x 10 photos colour & b&w
Photocopies - Offer of Employment
Letter of Acceptance, Personnel
Introduction Form, Decaration of Regular
Employment, Job Description, three
colour photographs and paper framed b&w photograph
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.