Looking East, showing bearing piles being driven in centre pier, and sheet piling in position for driving at East pier. Note traffic on temporary bridge.
Looking East, showing bearing piles being driven in centre pier, and sheet piling in position for driving at East pier. Note traffic on temporary bridge.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.