Photograph of construction of one of the Alcan potline buildings. Building with outer structure nearly complete is on the left. On the right further back is another building, and in front of it is part of a wall structure. There is piles of building material on the ground around too. Mountains with some snow in the background.
From the years 1953-1958, Mike Kinnear took photos during his school years, until graduation, while working for Fred Ryan Ltd. after school and holidays. Photos for him was a hobby, and he took many photos of the smelter and townsite as it grew around him. Mike also took a number of photos for the Kitimat Northern Sentinel, during the Ken Brumley and Pixie Meldrum years as editors. Mike and his family left Kitimat in 1958, but he spent the best part of 40 years in the photographic field, mainly in the retail/wholesale part of the photo industry.
Custodial History
Donated by Margaret and Mike Kinnear.
Scope and Content
Photograph of construction of one of the Alcan potline buildings. Building with outer structure nearly complete is on the left. On the right further back is another building, and in front of it is part of a wall structure. There is piles of building material on the ground around too. Mountains with some snow in the background.
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
An aerial photo of the refining column and rest of the Ocelot site after the refining column was lifted by Partec Ocelot cranes and properly installed and bolted down.
An aerial photo of the refining column and rest of the Ocelot site after the refining column was lifted by Partec Ocelot cranes and properly installed and bolted down.