Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of the Alcan boat dock. Trucks, cranes, and other various equipment on the wooden dock structure. There is a man behind a pile of sacks in the centre.
Photograph of the Alcan boat dock. Trucks, cranes, and other various equipment on the wooden dock structure. There is a man behind a pile of sacks in the centre.