Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
A gold Alcan wrist watch with black leather wrist straps. The face of the watch has markings that read "ALCAN SMU 06 "STOPS" FOR SAFETY" It is stored in a grey slide out box with a small instruction booklet inside.
A gold Alcan wrist watch with black leather wrist straps. The face of the watch has markings that read "ALCAN SMU 06 "STOPS" FOR SAFETY" It is stored in a grey slide out box with a small instruction booklet inside.