Looking south on Service Building area. Steel mat for bottom slab Transformer repair pit in foreground. Footings on Columb Lines D to M middleground; pre-cast yard extreme right backyard.
Looking south on Service Building area. Steel mat for bottom slab Transformer repair pit in foreground. Footings on Columb Lines D to M middleground; pre-cast yard extreme right backyard.
Photograph of Smeltersite looking east.. Foreground, perforated water pipe for ground water ditch. Middleground: Pre-cast concrete yard with storage stacks at right. Structural steel partially complete in Service Buildings Lines D to M. Footings for Potline 2 at right.
Photograph of Smeltersite looking east.. Foreground, perforated water pipe for ground water ditch. Middleground: Pre-cast concrete yard with storage stacks at right. Structural steel partially complete in Service Buildings Lines D to M. Footings for Potline 2 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.
Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.