A stage family acting out a scene by the Christmas tree. The lady in pink is sitting on the couch opening a present. There are four children and a husband watching her do so.
A stage family acting out a scene by the Christmas tree. The lady in pink is sitting on the couch opening a present. There are four children and a husband watching her do so.
Photo showing Helge Ronneseth and Kurt Zeiner from Norway. Alcan employees who first heard of Kitimat from an early copy of the Northern Sentinel; arrived as crew members of S.S. Sun Karen
Photo showing Helge Ronneseth and Kurt Zeiner from Norway. Alcan employees who first heard of Kitimat from an early copy of the Northern Sentinel; arrived as crew members of S.S. Sun Karen
First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".
First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photograph of town site, Alcan ; buildings in a line from the left to the middle ; a telephone or electricity line crossing over the picture ; landscape in background.
Photographs taken by Gordon Lee donated to the museum by his daughter Michelle Simeoni.
Scope and Content
Photograph of town site, Alcan ; buildings in a line from the left to the middle ; a telephone or electricity line crossing over the picture ; landscape in background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.