Photo showing Pot Room Fottings, looking north west from right to left, Lines M to J. Fottings poured on lines M to K. Forms being placed on Line J. Service Building walls at right. Pre-cast Yard in background.
Photo showing Pot Room Fottings, looking north west from right to left, Lines M to J. Fottings poured on lines M to K. Forms being placed on Line J. Service Building walls at right. Pre-cast Yard in background.
Fonds consists of over 200 photograph slides and photograph negatives from 1952 & 1953. Images are of Caisson dock construction, wharf and smeltersite construction.
Approximately 200 photograph slides and photographs
History / Biographical
Fred DeLory was an engineer on the Aluminum Company of Canada Ltd. smeltersite construction project f rom 1952 to 1953. He worked in an office that was located uphill from where the first pot lines were located. He went on to become a professor of civil engineering at the University of Toronto.
Scope and Content
Fonds consists of over 200 photograph slides and photograph negatives from 1952 & 1953. Images are of Caisson dock construction, wharf and smeltersite construction.