Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Photo showing 'Kitmano' docked at Kemano, B.C. (part of the Alcan Project). L/R Bob Ashmore, Dan Hayes (Supt. Wharf Alcan: Kitimat Works); Arv Sestrap (Insurance, Charter Business); Canada Life, Resident, District Rep. Kitimat
Photo showing 'Kitmano' docked at Kemano, B.C. (part of the Alcan Project). L/R Bob Ashmore, Dan Hayes (Supt. Wharf Alcan: Kitimat Works); Arv Sestrap (Insurance, Charter Business); Canada Life, Resident, District Rep. Kitimat