Skip header and navigation

Revise Search

3 records – page 1 of 1.

Caisson Construction for Alcan dock

https://collections.kitimatmuseum.ca/en/permalink/description146
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
April 30, 1953
Scope and Content
Photo depicts a view of caisson construction in their graving dock. The view is looking north at the timber bulkheads being installed.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
140
GMD
graphic material
Date Range
April 30, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a view of caisson construction in their graving dock. The view is looking north at the timber bulkheads being installed.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-342. Hal Whiting Collection 985.65.203
Subject Access
Smelters
Images

Aerial view of caisson construction in the graving dock

https://collections.kitimatmuseum.ca/en/permalink/description147
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
April 01, 1953
Scope and Content
Photo depicts an aerial view of the three caissons in their graving dock nearing completion.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
141
GMD
graphic material
Date Range
April 01, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts an aerial view of the three caissons in their graving dock nearing completion.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-323. Hal Whiting Collection 985.65.191
Subject Access
Smelters
Images

Caisson launching operation group

https://collections.kitimatmuseum.ca/en/permalink/description148
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
May 15, 1953
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
142
GMD
graphic material
Date Range
May 15, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Name Access
Hermann, Dick
Jenkinson, Cam
Malby, George
McCallum, Mr.
Van Houten, Mr.
Whiting, Hal
Whitton, J. B.
Wynne-Jones, Mr.
Subject Access
Smeltersite
Alcan Smelters & Chemicals Ltd.
Images