River Training Work: View downstream showing rock groyne on left (60% of total length), Drill rig at location of proposed direct intake in centre and dredging program on right.
River Training Work: View downstream showing rock groyne on left (60% of total length), Drill rig at location of proposed direct intake in centre and dredging program on right.
Eurocan's 35 foot aluminum Riverboat on West Tahtsa Lake. Riverboat can easily accommodate 8 people and is powered with a 200 H.P. diesel driven propulsion jet.
Eurocan's 35 foot aluminum Riverboat on West Tahtsa Lake. Riverboat can easily accommodate 8 people and is powered with a 200 H.P. diesel driven propulsion jet.
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.