River Training Work: View downstream showing rock groyne on left (60% of total length), Drill rig at location of proposed direct intake in centre and dredging program on right.
River Training Work: View downstream showing rock groyne on left (60% of total length), Drill rig at location of proposed direct intake in centre and dredging program on right.
Eurocan's 35 foot aluminum Riverboat on West Tahtsa Lake. Riverboat can easily accommodate 8 people and is powered with a 200 H.P. diesel driven propulsion jet.
Eurocan's 35 foot aluminum Riverboat on West Tahtsa Lake. Riverboat can easily accommodate 8 people and is powered with a 200 H.P. diesel driven propulsion jet.