View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.