Photo showing view looking north across Alumina Storage Building 504, forms being prepared for upper portion of east wall and dragline completing deep excavation at north end of building.
Photo showing view looking north across Alumina Storage Building 504, forms being prepared for upper portion of east wall and dragline completing deep excavation at north end of building.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo showing storage yard for material for construction on the Smeltersite Project, caisson docks at the back, potlines on the left, storage building in the middle.
Photo showing storage yard for material for construction on the Smeltersite Project, caisson docks at the back, potlines on the left, storage building in the middle.