Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Aerial photo of Kitimat's Kildala neighborhood, taken from the southwest looking northeast. On the left is the riverlodge construction camp. Bisecting the area is the sumgas creek.
Aerial photo of Kitimat's Kildala neighborhood, taken from the southwest looking northeast. On the left is the riverlodge construction camp. Bisecting the area is the sumgas creek.
Aerial photo of Kitimat's Kildala neighbourhood. City Centre is to the right, Quatsino Blvd is at the bottom and in the top left is the Riverlodge construction camp, bisecting the neighboorhood is sumgas creek.
Aerial photo of Kitimat's Kildala neighbourhood. City Centre is to the right, Quatsino Blvd is at the bottom and in the top left is the Riverlodge construction camp, bisecting the neighboorhood is sumgas creek.