Photo showing view looking south along railway right of way between Anderson and Moore Creeks showing excavation for steel water line and Tote Road at righht.
Photo showing view looking south along railway right of way between Anderson and Moore Creeks showing excavation for steel water line and Tote Road at righht.
Photo depicts a general view of the upper powerhouse excavation, looking toward the north end. Seen is the concrete elevator tower coming up from the lower powerhouse. Also, form work for concrete haunches is getting underway at the far end.
Photo depicts a general view of the upper powerhouse excavation, looking toward the north end. Seen is the concrete elevator tower coming up from the lower powerhouse. Also, form work for concrete haunches is getting underway at the far end.
Notes
Title based on content of photograph. -- Alcan ID No. KR-466. Alcan Collection
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of excavation for BH #8 & #9. Also Boiler House.