Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of hydraulic fill. Smoke from Kitimat townsite in distance.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of belly-dump unloading gravel on compacted fill. Kitimat Smeltersite.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of view of hydraulic fill area from cafeteria.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of high tide around hydraulic fill and graving dock.
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of hydraulic dredge cap. 20000 yds/day. Kitimat.
Photograph of looking northeast at utility buildings area showing placing of compacted fill in foreground and in background the building forms being erected. Multiple trucks and machinery visible. Some trucks are actively dumping the fill.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of looking northeast at utility buildings area showing placing of compacted fill in foreground and in background the building forms being erected. Multiple trucks and machinery visible. Some trucks are actively dumping the fill.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of hydraulic pipeline to potlines 3 + 4 and booster pump.
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.