Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.