Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of 1,800,000 yd compacted fill on left and 2,000,000 yd hydraulic fill on right.
Photo showing The Kenney Dam, also the construction site. The Nechako Reservoir started to fill in October 1952, and with completion of the Kenney Dam in 1954 a 145 mile long expanse of water covering 339 sq. miles was created.
Photo showing The Kenney Dam, also the construction site. The Nechako Reservoir started to fill in October 1952, and with completion of the Kenney Dam in 1954 a 145 mile long expanse of water covering 339 sq. miles was created.
Photo showing up to 16 of these dynamite sticks were used for each of the explosions it took to blast open the beaver dam. Fuse and cap were inserted at the end of the stick. The fuse burns at the rate of about a foot per minute.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing up to 16 of these dynamite sticks were used for each of the explosions it took to blast open the beaver dam. Fuse and cap were inserted at the end of the stick. The fuse burns at the rate of about a foot per minute.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of belly-dump unloading gravel on compacted fill. Kitimat Smeltersite.
Photograph of aerial view looking north showing compacted fill being placed for cryolite recovery plant and area south of potline 7. Machinery visible working.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of aerial view looking north showing compacted fill being placed for cryolite recovery plant and area south of potline 7. Machinery visible working.
Photograph of N.W. corner of smeltersite, looking east. Compacted gravel fill being placed and rolled in foreground. Stripping proceeding in middleground. Workers visible. Douglas Channel in background.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of N.W. corner of smeltersite, looking east. Compacted gravel fill being placed and rolled in foreground. Stripping proceeding in middleground. Workers visible. Douglas Channel in background.
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.