Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository.
Scope and Content
Photograph of bundles of aluminum cylinder ingots.
Clamp used to hold cow's head while milking. This device is very rusty and there is a red stain on the end with the chain. On the end of the chain there is a mount with six holes for adjusting the device. The loop on the other end is worn in such a way as to indicate that a _____ or pole was once threaded through it. On the Mount Patented 1910 is written
Clamp used to hold cow's head while milking. This device is very rusty and there is a red stain on the end with the chain. On the end of the chain there is a mount with six holes for adjusting the device. The loop on the other end is worn in such a way as to indicate that a _____ or pole was once threaded through it. On the Mount Patented 1910 is written
Photo showing smeltersite looking east showing progress of structural steel and aluminum cladding in potline 2 and concrete footings and pot recess flours in potline 1. Service Building, roofs are completed, substation and precast yard and storage in foreground.
Photo showing smeltersite looking east showing progress of structural steel and aluminum cladding in potline 2 and concrete footings and pot recess flours in potline 1. Service Building, roofs are completed, substation and precast yard and storage in foreground.