Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.
Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.