Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
One white binder containing archeological info from site blocks WAT001 + 002. Inside binder is also a red and white flash drive with digital files of already printed information.
Permit No. 2019-0327
Temporary No.: 21-008a-T1
Borden No.: TBD
Last Date of Visit: October 12, 2021
One white binder containing archeological info from site blocks WAT001 + 002. Inside binder is also a red and white flash drive with digital files of already printed information.
Permit No. 2019-0327
Temporary No.: 21-008a-T1
Borden No.: TBD
Last Date of Visit: October 12, 2021