Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
The front of a building built out of bricks with glass doors and windows in the front with three large crates in front of the building and gravel surrounding it.
1 photograph : b&w ; 12.8 x 10 cm
1 negative : b&w ; 12.4 x 9.9 cm
Scope and Content
The front of a building built out of bricks with glass doors and windows in the front with three large crates in front of the building and gravel surrounding it.