Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photocopies of documents from John McLachlan's early years with Alcan. Includes Offer of Employment, Letter of Acceptance, Personnel Introduction Form, Decaration of Regular Employment, and Job Description.
John McLachlan arrived in Kitimat in 1953 and went on to work at Alcan's Property Engineering Department for almost 40 years. He started out as a land surveyor and cartographer in the town's early years and ended his career as a Senior Legal Draftsmen.
Scope and Content
Photocopies of documents from John McLachlan's early years with Alcan. Includes Offer of Employment, Letter of Acceptance, Personnel Introduction Form, Decaration of Regular Employment, and Job Description.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113