Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.