Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
1 photograph :
b&w ; 18 x 12.5 cm
b&w ; 18 x 12.5 cm
Scope and Content
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
Photograph showing excavation being undertaken by Sagimat for temporary Septic Tank, being installed near intersection of Kuldo Blvd. and Drainage Canal in Kildala Neighbourhood (C).
Photograph showing excavation being undertaken by Sagimat for temporary Septic Tank, being installed near intersection of Kuldo Blvd. and Drainage Canal in Kildala Neighbourhood (C).