Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.
Photo showing when will Kitimat's first traffic control lights go into regular operation? It could be as early as next week as the electrical contractor's men near the end of the wiring job on the controllers above. Councillors plan to visit the scene when the design consultant arrives from Vancouver next Monday and then make a decision as to a start-up date for the installation.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing when will Kitimat's first traffic control lights go into regular operation? It could be as early as next week as the electrical contractor's men near the end of the wiring job on the controllers above. Councillors plan to visit the scene when the design consultant arrives from Vancouver next Monday and then make a decision as to a start-up date for the installation.