Skip header and navigation

Revise Search

2 records – page 1 of 1.

City Centre Construction

https://collections.kitimatmuseum.ca/en/permalink/description6387
Part Of
Max Patzelt fonds
Description Level
Item
GMD
graphic material
Date Range
[6 April 1973]
Accession Number
1998.1.6320
Scope and Content
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
Part Of
Max Patzelt fonds
Creator
Patzelt, Max
Description Level
Item
Accession Number
1998.1.6320
GMD
graphic material
Responsibility
Max Patzelt
Date Range
[6 April 1973]
Physical Description
1 photograph : b&w ; 10.4 x 12.6 cm 1 negative : b&w ; 9.9 x 12.5 cm
Scope and Content
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
Subject Access
commerce
Storage Location
Photograph Storage
Images
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
10 May 1967
Accession Number
2005.8.1882
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.1882
GMD
graphic material
Responsibility
Max Patzelt
Date Range
10 May 1967
Physical Description
1 photograph: b&w; 4" x 8"
Custodial History
Current: 1960s -District of Kitimat -Miscellaneous
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Subject Access
District of Kitimat
Bridges
Storage Location
Artifact Storage
Images