Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.