Skip header and navigation

Revise Search

2 records – page 1 of 1.

Beam and column construction in the powerhouse

https://collections.kitimatmuseum.ca/en/permalink/description82
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
August 23, 1953
Scope and Content
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
76
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
August 23, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
Subject Access
Powerhouses
Images

Construction of smelter lines numbers 1 and 2

https://collections.kitimatmuseum.ca/en/permalink/description151
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
1953
Accession Number
987.10.2
Scope and Content
Photo depicts the construction of smelter lines numbers 1 and 2.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
145
Accession Number
987.10.2
GMD
graphic material
Date Range
1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the construction of smelter lines numbers 1 and 2.
Notes
Title based on content of photograph. -- Photograph taken in the summer. District of Kitimat Collection
Subject Access
Industry
Images