Photographs of 2nd Kitimat Guide Co.
a- Thinking day Feb 22, 56. District Commissioner Leslie Creed. Assistant Leader Josephine Rewers, 2nd Kitimat Guide co. Sitting on gym floor.
b- 2nd Kitimat Girl Guide co. 1st birthday party Feb 57. Assistant Leader Joe Rewers. District Commissioner Les Creed, Velma Kernigham. Cutting a cake.
Gabriel (Gabor) Nyeste was one of the leaders of the Scouts of the First Kitimat Troop (Boy Scouts). He moved to Kitimat to work on the Alcan project and left in the early 60s. He passed away in Kamloops in July 2020.
Custodial History
Donated by Gabriel Nyeste, Aug 6 1983.
Scope and Content
Photographs of 2nd Kitimat Guide Co.
a- Thinking day Feb 22, 56. District Commissioner Leslie Creed. Assistant Leader Josephine Rewers, 2nd Kitimat Guide co. Sitting on gym floor.
b- 2nd Kitimat Girl Guide co. 1st birthday party Feb 57. Assistant Leader Joe Rewers. District Commissioner Les Creed, Velma Kernigham. Cutting a cake.
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.
Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.