Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo showing barge beached near the mouth of Moore Creek after a bad storm during the night of 8-9 December, no damage was done to the scow or load of housing material for the townsite.
Photo showing barge beached near the mouth of Moore Creek after a bad storm during the night of 8-9 December, no damage was done to the scow or load of housing material for the townsite.
Photograph of the cadets of RCSC "Kitamaat" practice ropework and knots during regular weekly training sessions. Church parade is planned for next Sunday.
Photograph of the cadets of RCSC "Kitamaat" practice ropework and knots during regular weekly training sessions. Church parade is planned for next Sunday.