Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph of the clearing contractor's men drilling a tree stump in preparation for blasting. Note how the chain saw has been modified for drilling purposes.
1 photograph : b&w ; 12.7 x 17.7 cm
1 negative : b&w ; 35 mm
Scope and Content
Photograph of the clearing contractor's men drilling a tree stump in preparation for blasting. Note how the chain saw has been modified for drilling purposes.