Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
To the right of the totem pole is D. G. H. Stevenson, and to the left of it (from right to left) is Sammy Robinson, Sam Lindsay, Hubert Lange, and _____?. The Canadian and British Columbian flags are hanging in the background.
To the right of the totem pole is D. G. H. Stevenson, and to the left of it (from right to left) is Sammy Robinson, Sam Lindsay, Hubert Lange, and _____?. The Canadian and British Columbian flags are hanging in the background.
Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.