Photo depicts Sam Hanna directing a crane operator in hoisting a crucible filled with molten aluminum on a potline.
Notes
Title based on content of photograph. -- Famed Canadian documentary photographer Malak Karsh was hired in the 1950s by Alcan to take photographs of Arvida and Kitimat. Many were published in Alcan literature and textbooks on Canada. A colourized version of this photograph appears in "The Story of British Columbia", The Story of Canada Series, 1966. Alcan Collection
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Notes
Title based on content of photograph. John Manders Collection
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212