Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
To the right of the totem pole is D. G. H. Stevenson, and to the left of it (from right to left) is Sammy Robinson, Sam Lindsay, Hubert Lange, and _____?. The Canadian and British Columbian flags are hanging in the background.
To the right of the totem pole is D. G. H. Stevenson, and to the left of it (from right to left) is Sammy Robinson, Sam Lindsay, Hubert Lange, and _____?. The Canadian and British Columbian flags are hanging in the background.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways, doing the honors at the Ribbon Cutting Ceremony for the opening of Highway No. 25, Terrace to Kitimat. A crowd of smiling people look on from the background.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways, doing the honors at the Ribbon Cutting Ceremony for the opening of Highway No. 25, Terrace to Kitimat. A crowd of smiling people look on from the background.
Notes
Title based on content of photograph. -- Photograph appears in the Northern Sentinel, November 28, 1957. Northern Sentinel Press Collection
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7