Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Photo of the aluminum smelting pot lines of Alcan and workers doing their jobs
'Metallurgical technicians checking electrical flow in the aluminum smelting pots of Alcan in Kitimat, B.C. while one operator adds alumina to the pots and another breaks surface crust"
Photo of the aluminum smelting pot lines of Alcan and workers doing their jobs
'Metallurgical technicians checking electrical flow in the aluminum smelting pots of Alcan in Kitimat, B.C. while one operator adds alumina to the pots and another breaks surface crust"
Photo on postcard of the Administrative Building of Alcan
"The Administrative Building of the Aluminum Company of Canada Ltd. Adjacent to this beautiful building is one of the three natural waterfalls in the area"
Photo on postcard of the Administrative Building of Alcan
"The Administrative Building of the Aluminum Company of Canada Ltd. Adjacent to this beautiful building is one of the three natural waterfalls in the area"
Photo of Alcan float in Canada Day parade
"One of the many floats entered in the annual July 1st Dominion Day parade, this one is a replica of the Aluminum Company's emblem. The floor is the new three million dollar, 113-bed hospital opened in April, 1960"
Photo of Alcan float in Canada Day parade
"One of the many floats entered in the annual July 1st Dominion Day parade, this one is a replica of the Aluminum Company's emblem. The floor is the new three million dollar, 113-bed hospital opened in April, 1960"