Photograph 'Looking west, "Lotus Seeker" Clam Shell Dredge fitted with 1 3/4 c.y. grab commences to throw up North Bank for Graving Dock. Primary dig to obtain flotation, borrow pit to be dug down to zero level.'
Photograph 'Looking west, "Lotus Seeker" Clam Shell Dredge fitted with 1 3/4 c.y. grab commences to throw up North Bank for Graving Dock. Primary dig to obtain flotation, borrow pit to be dug down to zero level.'
Photograph of: "Panorama taken from the roof of the main cafeteria building including the plant at left, the conveyor system and the dock and trailer camp at night"
Photograph of: "Panorama taken from the roof of the main cafeteria building including the plant at left, the conveyor system and the dock and trailer camp at night"
Photograph showing coke calcining area looking south. Note completed Kiln piers in background and buildings 509 and 510 foundation work in progress in foreground.
Photograph showing coke calcining area looking south. Note completed Kiln piers in background and buildings 509 and 510 foundation work in progress in foreground.