View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.